Skip to content

Registered electricians & solar installers across Gauteng

084 412 1814 Mon–Fri 07:00–17:00, Sat 08:00–13:00, 24/7 emergency callouts

Backup Power & Inverters in Fourways, Gauteng

Fourways · City of Johannesburg

Inverter & Backup Power Installation in Fourways

Inverters, lithium batteries and generator changeover systems installed and certified across Fourways.

  • Work done to SANS 10142-1 by a registered person
  • Same-day callouts in Fourways
  • Written quote before any work starts

Get a quote for Fourways

Send us the details and we come back with a time and a price.

Or call 084 412 1814 — we answer after hours for emergencies.

Registered & compliantWork carried out under a registered person to SANS 10142-1, the South African wiring code.
Same-day & 24/7 calloutsEmergency response around the clock, and same-day slots for standard work wherever possible.
Prices before work startsA written quote up front. No open-ended hourly work and no surprises on the invoice.
COC on completionCertificates of Compliance issued for every job that requires one, with test results attached.

Whether you want to ride out an outage or run through a full day without supply, we size and install inverter and battery systems in Fourways that do exactly what you asked for — no more, no less.

Fourways is defined by one of Johannesburg’s fastest-growing northern nodes — large security estates, high-density cluster complexes and major retail developments built largely in the last three decades, and the electrical work follows from that.

Because Fourways is supplied by City Power and Eskom (supply area varies by street) and falls within City of Johannesburg, there is a clear line between the network's responsibility and yours. It stops at the point of supply. We will tell you honestly which side of that line your fault sits on before you spend money on a private electrician for a network problem.

Backup Power & Inverters services we provide in Fourways

Load assessment

We measure what you actually run and tell you what it costs to keep each of it alive — before you commit to a system size.

Inverter installation

Correctly rated inverters installed with proper AC and DC protection, isolation and labelling.

Lithium battery banks

Battery sizing for real autonomy, with correct ventilation, mounting, fusing and communications to the inverter.

Essential-loads sub-board

A separate backed-up board so the circuits that matter stay live and the rest do not drain your battery.

Generator changeover

Manual and automatic changeover panels wired so that back-feeding into the network is impossible.

UPS for offices & equipment

Protecting tills, servers, access control, gates and medical or lab equipment through outages and dips.

Solar-ready installation

Systems wired so panels can be added later without replacing the inverter or redoing the board work.

Repairs to existing systems

Fault finding on inverters that trip, overheat, alarm or no longer charge, and replacing failed batteries.

What we see in Fourways

Business premises and trading hours

With the amount of commercial activity in Fourways, a lot of our work here has to happen around someone's trading day. We schedule shutdowns outside business hours where we can, isolate only what we must, and keep the parts of the installation that pay the bills running while we work.

Where the unit ends and the scheme begins

In sectional-title developments around Fourways, the most expensive arguments are about which side of the meter a fault sits on. Before we quote we establish whether the problem is inside the unit, in common property, or in the supply to the scheme — because that determines who pays, and a homeowner should not fund a body corporate's repair by accident.

The compliance side, explained plainly

Two documents decide whether a solar or inverter installation in Fourways is legal, insurable and safe to leave running. Most of the complaints we are called in to fix come down to one of them being missing.

An electrical Certificate of Compliance

Required for every solar or inverter installation regardless of size, because connecting one alters your electrical installation. It is also the first document an insurer asks for after a fire or lightning claim. Only a registered person may issue it, and only after testing the installation.

SSEG registration with City Power and Eskom (supply area varies by street)

Any system connected to the grid — even one that never feeds power back — must be registered as small-scale embedded generation with your supply authority. Registration needs a compliant inverter, a single-line diagram and your COC. A genuinely off-grid system with no grid connection does not need registration, but still needs a COC.

Municipal fees, timelines and any registration amnesties change regularly. We confirm the current position with City Power and Eskom (supply area varies by street) as part of every quote rather than quoting you last year's rules.

How it works in Fourways

  1. 1

    Site visit & load assessment

    We look at your roof, your board and your actual consumption — not a generic package.

  2. 2

    Written proposal

    System size, components, expected output, what it will and will not run, and the full price.

  3. 3

    Installation

    Mounting, DC and AC work, board integration and commissioning, usually within two to four days.

  4. 4

    Certification & registration

    COC issued, documentation handed over, and SSEG registration prepared where the system is grid-tied.

Backup Power & Inverters in Fourways — your questions answered

What can I run on an inverter in Fourways?

That depends entirely on size. A modest system comfortably covers lights, Wi-Fi, TV, gate motor, alarm and a fridge. Geysers, stoves, kettles, tumble dryers and pool pumps are heavy loads that push you into a much larger and more expensive system — we will show you the numbers either way.

Does an inverter installation need a COC?

Yes. Connecting an inverter alters your electrical installation, so it requires a Certificate of Compliance. Insurers routinely ask for it after fire or surge claims, and a system without one can leave you exposed.

Can I add solar panels later?

Yes, provided the inverter is chosen with that in mind. We size and wire systems in Fourways so panels can be added without replacing the core equipment — worth doing even if solar is a year or two away.

How long do batteries last?

Modern lithium batteries are typically rated for thousands of cycles and come with multi-year warranties. Lifespan depends on depth of discharge, temperature and how the system is configured — a badly set-up system ages a battery far faster than the datasheet suggests.

Can you fix a system another company installed?

Yes. We inspect, test and report on what is there, then quote the corrective work. Common problems we find are undersized cabling, missing DC protection, no changeover and no certification.

What payment methods do you accept?

EFT and card. You receive a written quote before work starts and a tax invoice on completion, along with any compliance documentation the job requires.

Need backup power & inverters in Fourways?

Call now for an arrival time, or send the details and we will quote you.

Call now WhatsApp Get a quote