Gauteng-wide
Solar Installation in Gauteng
Grid-tied, hybrid and off-grid solar, installed and certified — across Johannesburg, Pretoria, Centurion, the East Rand, the West Rand and the Vaal.
Solar in Gauteng is no longer about surviving load shedding — it is about what you pay your supply authority every month. Done properly, a correctly sized system pays for itself. Done badly, it becomes an expensive roof ornament with a compliance problem attached.
We install solar across Gauteng as electrical contractors first and solar installers second. That matters: the panels are the easy part. What determines whether your system is safe, legal and insurable is the DC protection, the earthing, the board work and the certification — and that is electrical work.
Gauteng is not one market. A board change in a 1950s Kensington house, a tenant fit-out in Sandton and a motor fault in a Wadeville factory are three different jobs needing three different approaches. That is why we organise by area — so the person who arrives already knows what the properties around you are like.
What our solar installation service covers
Consumption-based system design
We work from your actual usage profile — bills, tariff and load pattern — to size panels, inverter and battery. No guessing, no one-size-fits-all packages.
Grid-tied solar
Offsets your daytime consumption and cuts your bill. Requires SSEG registration with your supply authority.
Hybrid solar with battery backup
The most popular option in Gauteng: solar by day, battery through outages, grid as the fallback.
Off-grid systems
For smallholdings and properties with poor or no supply — sized with real autonomy margins, not best-case numbers.
Inverter & battery installation
NRS-compliant inverters, lithium battery banks, correct DC and AC protection, isolation and labelling.
Mounting & roof work
Rail systems suited to your roof type, with penetrations correctly sealed and cable runs protected from UV.
Electrical COC for the installation
A Certificate of Compliance is legally required for a solar installation regardless of its size. We test, certify and hand over the paperwork.
SSEG / municipal registration support
Grid-tied systems must be registered with your supply authority. We prepare the documentation — single-line diagram, inverter certificates, COC — and guide the application.
How it works
-
1
Site visit & load assessment
We look at your roof, your board and your actual consumption — not a generic package.
-
2
Written proposal
System size, components, expected output, what it will and will not run, and the full price.
-
3
Installation
Mounting, DC and AC work, board integration and commissioning, usually within two to four days.
-
4
Certification & registration
COC issued, documentation handed over, and SSEG registration prepared where the system is grid-tied.
Where we provide solar installation
Choose your area for local detail, response times and the questions we get asked most there.
Johannesburg & Joburg North
Ekurhuleni (East Rand)
Tshwane (Pretoria & Centurion)
West Rand
Sedibeng (Vaal Triangle)
Common questions about solar installation
Do I need to register my solar system in Gauteng?
If it is grid-tied — connected to the supply in any way, even without feeding back — yes. Small-scale embedded generation must be registered with your supply authority, which in Gauteng is your supply authority. Registration requires an electrical COC, a compliant inverter and a single-line diagram. Genuinely off-grid systems with no grid connection do not need SSEG registration, but still need a COC.
Does a solar installation need a Certificate of Compliance?
Yes — every solar installation needs an electrical COC regardless of size, because it is an alteration to your electrical installation. This is also the first document your insurer will ask for after a fire or lightning claim.
What size system do I need?
That comes from your consumption, not your roof. We look at your bills and load profile and size the array, inverter and battery to fit how you actually use power. Most homes in Gauteng land somewhere between 5 kW and 10 kW, but we would rather measure than guess.
How long does an installation take?
A typical residential system is installed in two to four days on site. The compliance side — COC, documentation and SSEG application — runs alongside and the approval timeline depends on your supply authority.
Will solar cover my whole house?
It can, but the honest answer for most properties is that it should not have to. Covering every load including geysers, pool pumps and electric heating gets expensive fast. We normally aim at the loads that give the best return and show you the numbers for going further.
Can you take over a system someone else installed?
Yes, and we are asked to do this often. We inspect what is there, test it, tell you plainly what is wrong and quote the remedial work needed to make it safe, certifiable and registerable.
What about load shedding?
Solar on its own stops producing at night and legally has to shut down during an outage unless it is designed for it. If backup through outages is your priority, you want a hybrid system with a battery — which is what most of our Gauteng customers choose.
Our other services
One team for everything electrical, from a single plug point to a full solar installation.
Electrician
Registered electricians on call across Gauteng
Learn moreResidential Electrician
Home electrical work done safely and signed off properly
Learn moreCommercial Electrician
Electrical contractors for offices, retail and hospitality
Learn moreIndustrial Electrician
Plant, motors and three-phase distribution
Learn moreBackup Power & Inverters
Inverters, batteries and generator changeover
Learn moreElectrical COC Certificate
Inspection, testing and certification by a registered person
Learn moreEmergency Electrician
24-hour callouts for electrical emergencies
Learn moreReady to get started?
Call us for an arrival time, or send your details and we will come back with a quote.