Skip to content

Registered electricians & solar installers across Gauteng

084 412 1814 Mon–Fri 07:00–17:00, Sat 08:00–13:00, 24/7 emergency callouts

Solar Installation in Centurion, Gauteng

Centurion · City of Tshwane

Solar Installers in Centurion

Grid-tied, hybrid and off-grid solar systems for Centurion — properly sized, compliantly installed, COC issued and SSEG registration handled for you.

  • Work done to SANS 10142-1 by a registered person
  • Same-day callouts in Centurion
  • Written quote before any work starts

Get a quote for Centurion

Send us the details and we come back with a time and a price.

Or call 084 412 1814 — we answer after hours for emergencies.

Registered & compliantWork carried out under a registered person to SANS 10142-1, the South African wiring code.
Same-day & 24/7 calloutsEmergency response around the clock, and same-day slots for standard work wherever possible.
Prices before work startsA written quote up front. No open-ended hourly work and no surprises on the invoice.
COC on completionCertificates of Compliance issued for every job that requires one, with test results attached.

We install solar across Centurion as electrical contractors first and solar installers second. That matters: the panels are the easy part. What determines whether your system is safe, legal and insurable is the DC protection, the earthing, the board work and the certification — and that is electrical work.

Known for the corridor between Pretoria and Midrand — security estates, office parks and technology campuses alongside older established suburbs, Centurion keeps our teams busy across every kind of installation from single plug points to three-phase distribution.

Supply in Centurion comes through City of Tshwane Electricity. If your whole street is dark, that is a network issue and we will say so. If it is only your property, the fault is inside your installation and that is exactly what we are here for.

Solar Installation services we provide in Centurion

Consumption-based system design

We work from your actual usage profile — bills, tariff and load pattern — to size panels, inverter and battery. No guessing, no one-size-fits-all packages.

Grid-tied solar

Offsets your daytime consumption and cuts your bill. Requires SSEG registration with your supply authority.

Hybrid solar with battery backup

The most popular option in Gauteng: solar by day, battery through outages, grid as the fallback.

Off-grid systems

For smallholdings and properties with poor or no supply — sized with real autonomy margins, not best-case numbers.

Inverter & battery installation

NRS-compliant inverters, lithium battery banks, correct DC and AC protection, isolation and labelling.

Mounting & roof work

Rail systems suited to your roof type, with penetrations correctly sealed and cable runs protected from UV.

Electrical COC for the installation

A Certificate of Compliance is legally required for a solar installation regardless of its size. We test, certify and hand over the paperwork.

SSEG / municipal registration support

Grid-tied systems must be registered with your supply authority. We prepare the documentation — single-line diagram, inverter certificates, COC — and guide the application.

What we see in Centurion

Complexes, clusters and estates

Cluster and estate living is a defining feature of Centurion, and it changes how electrical work has to be handled. Supply often runs through common-property infrastructure, work may need body corporate or estate approval, and the boundary between the unit owner's responsibility and the scheme's is frequently unclear. We are used to working within those rules and to putting the responsibility split in writing before we start.

Fit-outs, tenants and handovers

Commercial space in Centurion changes hands often, and each tenant leaves something behind — a data run, an extra circuit, a sign supply nobody documented. When we take on a fit-out we establish what is actually there before adding to it, so the next handover is cleaner than the last one was.

The compliance side, explained plainly

Two documents decide whether a solar or inverter installation in Centurion is legal, insurable and safe to leave running. Most of the complaints we are called in to fix come down to one of them being missing.

An electrical Certificate of Compliance

Required for every solar or inverter installation regardless of size, because connecting one alters your electrical installation. It is also the first document an insurer asks for after a fire or lightning claim. Only a registered person may issue it, and only after testing the installation.

SSEG registration with City of Tshwane Electricity

Any system connected to the grid — even one that never feeds power back — must be registered as small-scale embedded generation with your supply authority. Registration needs a compliant inverter, a single-line diagram and your COC. A genuinely off-grid system with no grid connection does not need registration, but still needs a COC.

Municipal fees, timelines and any registration amnesties change regularly. We confirm the current position with City of Tshwane Electricity as part of every quote rather than quoting you last year's rules.

How it works in Centurion

  1. 1

    Site visit & load assessment

    We look at your roof, your board and your actual consumption — not a generic package.

  2. 2

    Written proposal

    System size, components, expected output, what it will and will not run, and the full price.

  3. 3

    Installation

    Mounting, DC and AC work, board integration and commissioning, usually within two to four days.

  4. 4

    Certification & registration

    COC issued, documentation handed over, and SSEG registration prepared where the system is grid-tied.

Solar Installation in Centurion — your questions answered

Do I need to register my solar system in Centurion?

If it is grid-tied — connected to the supply in any way, even without feeding back — yes. Small-scale embedded generation must be registered with your supply authority, which in Centurion is City of Tshwane Electricity. Registration requires an electrical COC, a compliant inverter and a single-line diagram. Genuinely off-grid systems with no grid connection do not need SSEG registration, but still need a COC.

Does a solar installation need a Certificate of Compliance?

Yes — every solar installation needs an electrical COC regardless of size, because it is an alteration to your electrical installation. This is also the first document your insurer will ask for after a fire or lightning claim.

What size system do I need?

That comes from your consumption, not your roof. We look at your bills and load profile and size the array, inverter and battery to fit how you actually use power. Most homes in Centurion land somewhere between 5 kW and 10 kW, but we would rather measure than guess.

How long does an installation take?

A typical residential system is installed in two to four days on site. The compliance side — COC, documentation and SSEG application — runs alongside and the approval timeline depends on City of Tshwane Electricity.

Will solar cover my whole house?

It can, but the honest answer for most properties is that it should not have to. Covering every load including geysers, pool pumps and electric heating gets expensive fast. We normally aim at the loads that give the best return and show you the numbers for going further.

Can you take over a system someone else installed?

Yes, and we are asked to do this often. We inspect what is there, test it, tell you plainly what is wrong and quote the remedial work needed to make it safe, certifiable and registerable.

Need solar installation in Centurion?

Call now for an arrival time, or send the details and we will quote you.

Call now WhatsApp Get a quote